Construction of the house for the film “The Empty Room” began in early September.  Or original plan was to space the build out over several weeks and fire stories as they dried, but after a test build we determined that the box construction would require more dry time than anticipated so we opted to push the build into one very intense week.IMG_6476As with all projects we began with prepping clay and pressing the molds, one story at a time.  Each story needed about 100 lbs of clay wedged and weighed out into specific slugs to accommodate each mold.  Each floor was about 3 days, clay prep was the first.

IMG_6353 IMG_6351The second day was focused on pressing the molds and preparing the wall for assembly.  This was a huge job, as the pieces are very complex and have many details that needed to be prepped on the same day.  Not only did we make molds for the build, but also many of the tools were custom-made for the project.   This tool was designed to give us perfect cuts on the edges of the walls and floor so we could more precisely control fit.

IMG_6349The day following pressing was assembly.  The floor was put in place first and the corner with the stairs was attached to the floor.  This is the second floor.  The cut outs pictured here will be for the staircase on the floor beneath.

IMG_2067 IMG_2068Once the corner was reinforced and secure, the staircase was attached.  We began with the landing and the bottom half and built up from there.  These pics are also of the second floor and so include a handrail that is not present on the first floor.

IMG_2069 IMG_2073 IMG_2074 IMG_2077 IMG_2031IMG_2083The windows were cut earlier on this story to give us access to the underside as the entire stair well is likely to be shown in the film and needed to fe completely finished.

After the stairs we put on the remaining two walls were applied.  With each wall the corners and other details from the molds had to be tuned back up as handling was somewhat damaging.

IMG_2021Once all four walls were in place, the flange was attached to the top and cutting windows and clean up and finish work could be done.

IMG_2033 IMG_2042 Another thing we learned from the test build was that the walls wanted to move quite a bit during the drying process.  To control this to some degree Gabe devised a cap to fit into the flange and stay with the floor throughout its shrinking and firing process.  This was a fairly last-minute addition to the group of molds and had to be resolved quickly, so the original was made from a combination of wood and clay.

IMG_6442 IMG_6454The first two floors were very similar and so we could build a skill set from one two the next and refine the process.  The third floor was another matter, There are far more windows on this floor and another wall inside the structure.  It also has a large facade and a roof.  Mold prep was the same in many ways, but with molds we had not yet used in an order that we had not tested, this was the greatest challenge of the project.

IMG_6481 IMG_6482 IMG_6485 IMG_6489 IMG_6490 IMG_6496 IMG_6499 IMG_6504Because they were made so close to one another we were able to see them wet all at once, which made a great group.

IMG_2154